Time: July 2016
Sewage treatment capacity: 20m³/h
Waste gas treatment capacity: 5000 m³/h
Nature of original site: chemical pollution site
Main pollution components: COD, chloroform, etc
Wastewater treatment process: underground regulating tank + horizontal stripping tower + Fenton reactor + activated carbon adsorption + clear water tank
Waste gas treatment process: stripping collection system + heat exchanger + horizontal absorption tower + activated carbon adsorption + photocatalytic oxidation purifier
Reference emission standard: integrated wastewater discharge standard (GB8978-1996) integrated emission standard of air pollutants (GB16297-1996)