Ecological restoration of soil and groundwater Hazardous waste treatment project Waste gas treatment project
Beijing Dongfang Chemical plant contaminated site remediation and risk control project
Source:Xijiu E.P. Time:2020-10-09 14:09
Time: June 2018
 
Nature of original site: chemical pollution site
 
Repair quantity: soil: 50000 cubic meters
                            Gas volume: 1000m3/h; water volume: 10t / h
 
Main pollutants: volatile or semi volatile organic compounds such as 2,5-dichloro-1,4-phenylenediamine and vinyl chloride
 
Treatment process: gas: gas-liquid separation + vacuum pump + activated carbon adsorption
                                  Water: oil separator + stripper + Fenton skid + sand filter skid + recharge tank
 
Highlights of the project: the influence radius is more than 2m; the equipment is stacked in double layers to save space; large area of soil is restored at the same time
 
Return:


Contact Us

18921308999(Mr. Jiang)

0510-68998668,68998667 Work hours 8:00-17:00
Scan your mobile phone
Copyright © 2020 Wuxi Xijiu Environmental Protection Technology Co., Ltd All Rights Reserved  苏ICP备20042235号-1  XML Map  
18921308999